Poteet Construction Poteet Construction has over 30 years experience providing ATSSA certified traffic control services for highway, urban, federal and special event projects. We are the leader in construction traffic control and safety services throughout Montana and surrounding states. We are well known for our quality and reliability with the highest safety rating and competitive pricing.

Whether your project includes traffic control, concrete work, steel barrier, permanent sign or guardrail installation, flagging, temporary traffic signals, construction fencing or wide load movements - you can depend on Poteet Construction to get the job done.
Services
Our company has been recognized many times for its concrete work and has a reputation for quality and dependability that is second to none. Awards in concrete work include First Place for Concrete Excellence by the Montana Contractors Association, for concrete paving, curb & gutter, and patterned colored concrete.
Reviews (6)
Write a Review
Caitlin Nelson
May 11, 2022
No plan for citizen emergencies, poor communication with people passing through work zones, a lot of the workers are rude, and they don't put adequate signage up. Dump trucks never cover their loads either. Atrocious traffic control and direction. I wouldn't recommend this company for anything except causing problems. Do better, Poteet.
B. Rad
Nov 06, 2021
Whoever is in charge of setting up the flow of traffic needs to find a new career. The job they are doing in Fergus County has gotten ridiculous. It took 42 minutes to go less than four miles today. It's sad you leave an hour early and are still 15 minutes late because of them. I hope someone is looking into the time they are taking and delays that they are causing people.
Josh Sluis
Sep 26, 2021
Should never again be awarded a state contract. Absolutely no control of or conscious plan to control traffic flow or patterns. The work (resurfacing 93 north of lakeside) looked adequate and even. But the process and procedure of their PM's is the worst I've ever seen. One of their PMs or supervisors was super condescending and rude when two of us followed him out accidentally instead of the pilot car. 60+ minutes to get in the correct flow! Unnecessary, the random bouncing around and monopolizing 9 miles of road at once is atrocious. Please invest in a better planning phase before going forward to more state bids.
Mike Kelly
Aug 18, 2021
Worst road construction plan ever. Sat on highway 2 for 30 minutes without moving.
Roger Idaho
Feb 12, 2021
Nice job flagging Idaho Street in Kalispell guys :/. You failed to close the left hand turn lane onto 7th EN when you had 7th completely closed. This allowed motorists to attempt to make the left turn, only to discover they could not, and leaving them stranded in the face of oncoming traffic! YOU caused a dangerous situation which ultimately resulted in an accident.
Hodges
Jun 04, 2020
We have never seen such horrible built dirt roads next to a work area that has major traffic flow. The potholes in the road are large enough to swallow small cars. In all our travels we have never had roads this bad.